PC SOFT

WINDEVWEBDEV AND WINDEV MOBILE
ONLINE HELP

Home | Sign in | English UK

WINDEV
WindowsLinuxUniversal Windows 10 AppJavaReports and QueriesUser code (UMC)
WEBDEV
WindowsLinuxPHPWEBDEV - Browser code
WINDEV Mobile
AndroidAndroid Widget iPhone/iPadApple WatchUniversal Windows 10 AppWindows Mobile
Others
Stored procedures
..DayBreakHeight is used to find out and modify the height of the breaks between the days in a Scheduler control where the days are displayed in row and the resources in column.
Example
IF CBOX_WithBreaks = True THEN
SCH_MySchedule..DayBreakHeight = 25
ELSE
SCH_MySchedule..DayBreakHeight = 0
END
Syntax

Finding out the height of the breaks between the days Hide the details

<Result> = <Control name>..DayBreakHeight
<Result>: Integer
  • Height of the breaks in pixels.
  • 0 if there is no break.
<Control name>: Character string (with or without quotes)
Name of Scheduler control used.

Modifying the height of the breaks between the days Hide the details

<Control name>..DayBreakHeight = <New height>
<Control name>: Character string (with or without quotes)
Name of Scheduler control used.
<New height>: Integer
  • New height for the breaks between the days expressed in pixels.
  • 0 to disable the breaks between the days.
Minimum version required
  • Version 17
This page is also available for…
Comments
Click [Add] to post a comment