|
|
|
|
|
|
|
|
|
|
- Overview
- Conversion from the report editor
- Copy from the report editor to the window editor
- Copy from the report editor to the page editor
Copying controls from the report editor
The controls can be copied from the report editor: - to the window editor.
- to the page editor.
Conversion from the report editor Copy from the report editor to the window editor The following controls are supported during this copy: | | | Control found in the report editor | Control copied into the window editor |
|---|
| Static | Button | | Item | Static | | Image | Image | | Bar Code | Bar Code | | RTF | Static | | HTML | Static | | Preset | Static | | Chart | Chart | | Check Box | Check Box | | Link | Button | | Edit | Edit | | Scheduler | Scheduler | | Calculation | NA | | Shape | NA | | Internal Report | NA |
Copy from the report editor to the page editor The following controls are supported during this copy: | | | Control found in the report editor | Control copied into the page editor |
|---|
| Static | Button | | Item | Formatted control | | Image | Image | | Bar Code | Bar Code | | RTF | HTML static | | HTML | Formatted display control | | Preset | Formatted display control | | Chart | Chart | | Check Box | Check Box | | Link | Link | | Edit | Edit | | Scheduler | Scheduler | | Calculation | NA | | Shape | NA | | Internal Report | NA |
This page is also available for…
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|