- Properties specific to GanttLink variables
- Notes
- Using GanttLink variables
GanttLink (Type of variable) In french: LienGantt
The GanttLink type is used to define the advanced characteristics of a link between two tasks of a Gantt chart. The characteristics of this link can be defined and changed using different WLanguage properties. Remark: For more details on the declaration of this type of variable and the use of WLanguage properties, see Declaring a variable. // Retrieve all the links that point to "ID1" arrLink is array of GanttLink arrLink = GanttListLink(COL_Gantt, "ID1") Link is GanttLink FOR EACH Link OF arrLink Trace("Linked to " + Link.SourceID) END
Remarks Properties specific to GanttLink variables The following properties can be used to handle a link between two Gantt tasks: | | | Property name | Type used | Effect |
---|
DestinationID | Character string | Identifier of the target task. This identifier corresponds to the ID property defined in the GanttTask variable. | SourceID | Character string | Identifier of the source task. This identifier corresponds to the ID property defined in the GanttTask variable. | Type | Integer constant | Type of link. The available types of links are as follows: - gltStartToStart: "Start to Start" link: The target task can only start if the source task is started.
- gltStartToEnd: "Start to End" link: The destination task cannot end as long as the source task is not started (rare case).
- gltEndToStart (default value): "End to Start" link: The target task cannot start as long as the source task is not ended.
- gltEndToEnd: "End to End" link: The destination task cannot end as long as the source task is not ended.
|
Notes - A link between 2 tasks is represented by an arrow.
- This type of variable:
- An "End to Start" link is created by default between two tasks: the task corresponding to the SourceID property must be finished before the DestinationID task can start.
- According to their types, the links are drawn on the start or end borders of the tasks.
Using GanttLink variables GanttLink variables are used by the following functions:
| | GanttAddLink | Creates an "End to Start" link between two tasks displayed in a Gantt Chart column found in a Table (or TreeView Table) control. | GanttDeleteLink | Removes links from a Gantt Chart column in a Table or TreeView Table control. | GanttListLink | Lists the links found in a Gantt Chart column found in a Table (or TreeView Table) control. |
Related Examples:
|
Complete examples (WINDEV): WD Gantt
[ + ] The "WD Gantt" example presents an advanced use of the Gantt Chart control. This example is used to create a Gantt chart with tasks, links, cumulative tasks and milestones. The tasks can be edited in a specific window. The created chart can be saved in a file and reloaded thereafter.
|
|
Unit examples (WINDEV): The Gantt control
[ + ] Using a Gantt Chart control
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|