ONLINE HELP
 WINDEVWEBDEV AND WINDEV MOBILE

This content has been translated automatically.  Click here  to view the French version.
Help / WLanguage / WLanguage functions / Controls, pages and windows / Scheduler functions
  • Positioning in the Scheduler control
WINDEV
WindowsLinuxUniversal Windows 10 AppJavaReports and QueriesUser code (UMC)
WEBDEV
WindowsLinuxPHPWEBDEV - Browser code
WINDEV Mobile
AndroidAndroid Widget iPhone/iPadIOS WidgetApple WatchMac CatalystUniversal Windows 10 App
Others
Stored procedures
Displays a Scheduler control from a specified date or returns the date of the first day (or last day) displayed in a Scheduler control.
Universal Windows 10 App In Universal Windows 10 App mode, this function can only be used to handle the Scheduler controls found in a report.
Example
// Positionne le champ Planning sur la date du jour
SchedulerPositionDateTime(PLN_Planning, Today())

// Positionne le champ Planning au 20 décembre 2018
SchedulerPositionDateTime(PLN_Planning, "20181220")
// Renvoie la première date et heure affichée dans le champ Planning
Trace(SchedulerPositionDateTime(PLN_Planning, orgDateTimeFirstVisible))
// Renvoie par exemple: 20220309175800000
Syntax

Positioning the schedule on a specified date Hide the details

SchedulerPositionDateTime(<Scheduler control> , <Start date>)
<Scheduler control>: Control name
Name of Scheduler control to use. This control can correspond to:
  • the Scheduler control of a window,
  • the Scheduler control of a report.
<Start date>: Character string or Date variable
Start date for the display.

Finding out the first date or the last date displayed by the Scheduler control Hide the details

<Result> = SchedulerPositionDateTime(<Scheduler control> [, <Sought date>])
<Result>: Character string, Variable of type Date or DateTime
Date (or Date and Time) displayed by the Scheduler control.
<Scheduler control>: Control name
Name of Scheduler control to use. This control can correspond to:
  • the Scheduler control of a window,
  • the Scheduler control of a report.
<Sought date>: Optional Integer constant
Type of sought date:
orgDateTimeFirstVisibleFirst date and time displayed in the Scheduler control (depending on the position of the elevator).
Android Not available.
schCurrentMonthFirst day of the month displayed in the Scheduler control.
schEndDateLast date displayed in the Scheduler control.
schStartDate
(Default value)
First date displayed in the Scheduler control.
Remarks

Positioning in the Scheduler control

When SchedulerPositionDateTime is used to display a date, the Scheduler control keeps your display preferences.
For example, if the Scheduler control displayed is a weekly schedule starting from Monday, SchedulerPositionDateTime used on a Friday displays the schedule from Monday to Sunday for the week that includes the specified Friday.
Component: wd290mdl.dll
Minimum version required
  • Version 17
This page is also available for…
Comments
Click [Add] to post a comment

Last update: 02/23/2023

Send a report | Local help